×

loading stress造句

"loading stress"是什么意思   

例句与造句

  1. Advancing load stress
    升高载荷应力
  2. Over - time working , over - loading stress plus un - healthy diet caused her serious problems of poor digestion , immune system , female menses
    她算是科技新贵族的中高薪阶级,但是却为了高薪的工作牺牲了身体的健康,想想实在不值得。
  3. On the basis of a great deal of calculation , a simple and rational calculation method of the loading stress of utw pavement is brought forward
    通过大量计算,提出了utw路面荷载应力实用计算方法。最后,介绍了我国第一条utw路面试验路的修筑情况。
  4. Fatigue property of lean concrete should be studied when the material is set as base course since it withstands the repeated actions of load stress and temperature stress
    摘要贫混凝土用于路面基层时,由于受到荷载应力和温度应力的反复作用,需研究其疲劳特性。
  5. Material notch sensitivity test is a method which is used for certain material to measure and estimate the capability of resisting cr ack growth on the occasion of existing load stress and notch
    材料缺口敏感性试验是测定或评价某一材料在静载荷的应力条件下和有缺口的情况下,抵抗裂缝扩展能力的一种方法。
  6. It's difficult to find loading stress in a sentence. 用loading stress造句挺难的
  7. Based on the present research productions , load stress and temperature stress of asphalt pavement with lean concrete base are additionally calculated and the influence of correlated factors is analyzed
    在现有研究成果基础上,补充计算了贫混凝土基层沥青路面的荷载应力和温度应力,并分析了各因素的影响。
  8. Since the louisville utw experiment , although , some utw experimental projects have been built in united state , the loading stress of utw pavement has not been analyzed by theoretical calculation
    作为一种新型、有效、快速、经济且简便的旧沥青路面维修技术,虽自lousiville试验路后在美国已进行了大量试验路研究,但在路面结构荷载应力分析方面尚属空白。
  9. When the load stress and temperature stress of road slabs combine in a disadvantaged state , pavment structures may be distressed when a large axle load loading one time , the fatigue of pavment structures becomes insignificant
    当路面板荷载应力与温度应力的组合处于不利状态时,过大轴载的一次作用就可能造成路面结构的破坏,路面结构的抗疲劳性则无从谈起。
  10. The existing methods of structure design of concrete pavement with lean concrete base are analyzed , proving that the equivalent stiffness method is proper for calculating load stress but not for thermal stress
    对贫混凝土基层混凝土路面现有结构设计方法的应力计算进行了分析,发现等刚度法用于双层板路面的荷载应力计算是可行的,但用于温度应力计算会引起较大的误差。
  11. The formula of axle load conversion in the standard has some problems , so respectively according to the corresponding formulas of load stress and fatigue equations of concrete pavement and lcb , the different formulas of axle load conversion and fatigue stress coefficients are put forward
    针对规范中轴载换算存在的问题,分别根据面层和基层的荷载应力公式和疲劳方程,提出轴载换算公式以及疲劳应力系数。
  12. Teachers " character , belief , professional quality , teaching environment should be taken into consideration while making self - adjustments to relieve over - loaded stress . self - adjustments fall into two categories : one is emotion controlling ; the other is problem solving
    调适教师职业压力应从教师的个性品质、思想观念、业务素质、工作环境等多方面着手,但自我调适可以归纳为两大类:一是处理情绪,一是处理问题。
  13. The load stress and the thermal stress of concrete pavement with lean concrete base are analyzed by three - dimensional finite element method , and the practical formulas of load stress under different axle load models and of thermal stress are get by regression method
    利用三维有限元方法对贫混凝土基层混凝土路面进行了荷载应力和温度应力的大量计算,通过回归,得出了贫混凝土基层混凝土路面荷载应力及温度应力实用计算公式。
  14. ( 2 ) a statistical damage constitutive model is used to explore the feature that the stress - strain curve of damage rock curls upward when the loaded stress is little . and the mixture method is used to realize the coupling of rock without damage , damage and fluid
    ( 2 )探讨了用损伤统计本构模型模拟应力应变曲线第一阶段稍向上弯曲特征建模问题,采用混合物理论探讨了非损伤岩石、损伤和液相的耦合问题和模拟应力应变曲线第一阶段稍向上弯曲特征建模问题。
  15. Lastly , with the fatigue equation , the paper establishes the fatigue stress coefficient which is used in the load stress calculation for lean concrete as undersurface of cement concrete pavement , and the structure coefficient of flexural tensile strength which is used in the flexural stress check for lean concrete as base of asphalt pavement
    利用得出的疲劳方程,建立贫混凝土作为水泥混凝土路面下面层荷载应力计算的疲劳应力系数,以及作为沥青路面基层时,进行层底弯拉应力验算的弯拉强度结构系数。
  16. In this paper , a three dimensional finite element analysis has been used to analyse the loading stress of utw pavement . the critical loading position of utw plate and the rules of the effect of the joint spacing of plate , the thickness of overlay , ec / es and the interface conditions between concrete overlay and existing ac on the stress are provided
    本文采用三维有限元法分析了utw路面荷载应力,确定了路面板的临界荷位,得出了板接缝间距、厚度、板与地基模量比( ec es )和层间接触状况对应力的影响规律。
  17. 更多例句:  下一页

相邻词汇

  1. "loading stage"造句
  2. "loading state"造句
  3. "loading station"造句
  4. "loading strain"造句
  5. "loading strength"造句
  6. "loading surface"造句
  7. "loading surface height"造句
  8. "loading surplus"造句
  9. "loading survey"造句
  10. "loading system"造句
桌面版繁體版English日本語

Copyright © 2025 WordTech Co.

Last modified time:Tue, 12 Aug 2025 00:29:56 GMT